International Projects
Company Name | Services | Cost | Completed Date |
Jet Mixer Project | Supply 2 off mixer pumps 33mm long 90 kw motor, wet end and columns rotate on a Slewing ring for crude oil storage tanks | 15,000,000 US$ | Ongoing Project |
Rand Water | Pump assembly and installation | 5,000,000 US$ | Ongoing Project |
Eigenbau | Supply of 12 off axil flow pumps to replace existing APE axil flow pumps | 4,500,000 US$ | Ongoing Project |
Blantyre water Board Malawi | Manufacturing & supply of spare parts for Mather & Platt pumps and supply of 1-off complete pump set with 3 stage PSV 80LF4 pump. | 566,426 US$ | Ongoing Project |
Blantyre water Board Malawi | Installation and Completion of part existing mechanical equipment with new supply and installation / Commissioning of electrical equipment | 4,484,000 US$ | 2015 |
Blantyre water Board Malawi | Including all new high pressure pump sets, with all electrical and civil works/supply contract completed in association with WPIL-India | 6,880,000 US$ | 2015 |
Department of Water Affairs | Supply pf PVC-pipes, Pipe, fittings and valves for 3 years. | 9,000,000 US$ | 2012 |
Lusaka Water & Sewerage Corp (In Joint Venture with Civil Partner RJR Construction Zambia LTD) | The Contract is for the over haul of Iolanda WTW. Supply & Installation of a New River INTAKE Pump Station (with APE vertical turbine pumps) as well as overhaul of other pumps and plants. | 2,810,000 US$ | 2011 |
RSSC Simunye Sugar Swaziland | Refurbishment of a 1200 NB & 1500 NB-Larner Johnson valve | 100,000 US$ | 2010 |
NFC-African Mining, Chambishi CM, Zambia | Manufacture & supply of HPH 54-25-5+1 stage pump with supply of maintenance spares of HPH54-25 pumps. | 951,803 US$ | 2009 |
Department of Water Affairs | Supply of piping, pipe fitting & valves | 2,307,693 US$ | 2009 |
Mopani CM Nkana | Manufacture & Supply of 2-off HPH 58/54-25-4 stage pumps with internal parts all coated for acid water pumping | 325,000 US$ | 2007 |
R.S.S.C Simunye Mhlume Sugar | Supply and installation of 3-off complete weir gate ass' blies with driving equipment | 188,500 US$ | 2007 |
Mopani Copper Mines Zambia | Renewing of pump refurbishment project "for 5 years" including: Supply of all pump parts and pump refurbishment at the Mindola workshop in Kitwe. | 32,000,000 US$ | 2007 |
Department of Water Affairs | Supply of piping, pipe fitting and valves | 3,078,000 US$ | 2007 |
Mopani Copper Mines Mufulira Zambia | Supply and installation of 450NB high pressure rising main in mineshaft, including connections on to existing pump sets complete. | 586,000 US$ | 2007 |
Mopani and Luanshaya Copper Mines | Ongoing pump refurbishment projects for Mopani and Luanshya mines: pump repairs at Mindola workshops. | 14,000,000 US$ | 2007 |
CPMZ Zimbabwe | Supply of equipment and spares for high pressure pumps for transfer of fuel from Mozambique to Zimbabwe. Basic engineering redesign of pumps. | 920,000 US$ | 2004 |
Simunye Sugar | Supply and install 4 x electric actuator for main rive pumps and electrical control system | 70,000 US$ | 2004 |
Annual supply of maintenance Spares for Mather&Platt irrigation pumps | 1,000,000 US$ | ||
PCI-Grinaker/Lta Augostinho neto University-Luanda | Installation of 3-off pumps stations with supply and manufacturing of PVC-interconnecting pipe works etc. | 230,000 US$ | 2004 |
CPMZ-Zimbabwe Beira Mozambique | Supply and installation of new fuel receiving station at Mature Zimbabwe | 320,000 US$ | 2002 |
Zomba Water Treatment Plant CMC/CCC Lahmeyer-Stewart Scott Joint Venture Zomba, Malawi | Turnkey mechanical/electrical new water treatment plant Upgrade existing plant New intake structure Pressure reducing station | 1,400,000 US$ | 1999-2`001 |
Coca Cola Nampula Mozambique | Electrical installation at the new Coca Cola bottling plant. Design, supply and install and commission main incoming supply. | 597,000 US$ | 1999 |
Ilios Oil Edible Oil Refinery Gauteng | Supply and install test and commissioning of structural, electrical mechanical, piping and instrumentation packages | 383,334 US$ | 1998 |
Mozal Main Substation Mozambique | Supply and install test and electrical work, commissioning of lighting and small power installation including transformer, distribution boards and street lighting | 300,000 US$ | 1997-1998 |
Blantyre Water Board Malawi | Installation of 35km of 700NB pipe 70 bar working pressure. All air valve chambers, crossover Tees and auxiliary equipment for cathodic protection on duplication of pipelines. | 1,816,667 US$ | 1998 |
National Starch Wadeville Gauteng | Supply and installation of mechanical structural, electrical and instrumentation-Glass dissolving packages plant. | 283,332 US$ | 1998 |
Royal swazi Sugar Simunye Swaziland | Drought relief pump station 4 off high flow pumps and 300m 1200 pipeline, all electrical controls and engineering design. | 249,167 US$ | 1995 |
Mzuzu Water Water Treatment | Water affairs Gullivar/Cilcon joint Venture Mzuzu water treatment | 1,111,778 US$ | 1992-1994 |
Sasol 1 Sasolburg South Africa For Treatment (Pty) Ltd | Installation of fuel distribution network system 800 NB pipe all work in accordance to API 1104. | 361,280 US$ | 1990-1991 |
Botswana meat Commission Lobatse Botswana For Wright Dixon | Installation of new Sulzer cooling towers of all auxiliary pipe work. | 1,213,970 US$ | 1989 |
Zimbabwe power Corporation And Havelock Asbestos Mine Zimbabwe & Swaziland For Wright Dixon | Removal of 3.75MW steam turbines plus all auxiliary equipment, re-installation and commissioning of all above equipment and new steam piping. | 202,715 US$ |
1988 |