International Projects


Company Name Services Cost Completed Date
Jet Mixer Project Supply 2 off mixer pumps 33mm long 90 kw motor, wet end and columns rotate on a Slewing ring for crude oil storage tanks 15,000,000 US$ Ongoing Project
Rand Water Pump assembly and installation 5,000,000 US$ Ongoing Project
Eigenbau Supply of 12 off axil flow pumps to replace existing APE axil flow pumps 4,500,000 US$ Ongoing Project
Blantyre water Board Malawi Manufacturing & supply of spare parts for Mather & Platt pumps and supply of 1-off complete pump set with 3 stage PSV 80LF4 pump. 566,426 US$ Ongoing Project
Blantyre water Board Malawi Installation and Completion of part existing mechanical equipment with new supply and installation / Commissioning of electrical equipment 4,484,000 US$ 2015
Blantyre water Board Malawi Including all new high pressure pump sets, with all electrical and civil works/supply contract completed in association with WPIL-India 6,880,000 US$ 2015
Department of Water Affairs Supply pf PVC-pipes, Pipe, fittings and valves for 3 years. 9,000,000 US$ 2012
Lusaka Water & Sewerage Corp (In Joint Venture with Civil Partner RJR Construction Zambia LTD) The Contract is for the over haul of Iolanda WTW. Supply & Installation of a New River INTAKE Pump Station (with APE vertical turbine pumps) as well as overhaul of other pumps and plants. 2,810,000 US$ 2011
RSSC Simunye Sugar Swaziland Refurbishment of a 1200 NB & 1500 NB-Larner Johnson valve 100,000 US$ 2010
NFC-African Mining, Chambishi CM, Zambia Manufacture & supply of HPH 54-25-5+1 stage pump with supply of maintenance spares of HPH54-25 pumps. 951,803 US$ 2009
Department of Water Affairs Supply of piping, pipe fitting & valves 2,307,693 US$ 2009
Mopani CM Nkana Manufacture & Supply of 2-off HPH 58/54-25-4 stage pumps with internal parts all coated for acid water pumping 325,000 US$ 2007
R.S.S.C Simunye Mhlume Sugar Supply and installation of 3-off complete weir gate ass' blies with driving equipment 188,500 US$ 2007
Mopani Copper Mines Zambia Renewing of pump refurbishment project "for 5 years" including: Supply of all pump parts and pump refurbishment at the Mindola workshop in Kitwe.   32,000,000 US$ 2007
Department of Water Affairs Supply of piping, pipe fitting and valves 3,078,000 US$ 2007
Mopani Copper Mines Mufulira Zambia Supply and installation of 450NB high pressure rising main in mineshaft, including connections on to existing pump sets complete. 586,000 US$ 2007
Mopani and Luanshaya Copper Mines Ongoing pump refurbishment projects for Mopani and Luanshya mines: pump repairs at Mindola workshops. 14,000,000 US$ 2007
CPMZ Zimbabwe Supply of equipment and spares for high pressure pumps for transfer of fuel from Mozambique to Zimbabwe. Basic engineering redesign of pumps. 920,000 US$ 2004
Simunye Sugar Supply and install 4 x electric actuator for main rive pumps and electrical control system 70,000 US$ 2004
Annual supply of maintenance Spares for Mather&Platt irrigation pumps 1,000,000 US$
PCI-Grinaker/Lta Augostinho neto University-Luanda Installation of 3-off pumps stations with supply and manufacturing of PVC-interconnecting pipe works etc. 230,000 US$ 2004
CPMZ-Zimbabwe Beira Mozambique Supply and installation of new fuel receiving station at Mature Zimbabwe 320,000 US$ 2002
Zomba Water Treatment Plant CMC/CCC Lahmeyer-Stewart Scott Joint Venture Zomba, Malawi Turnkey mechanical/electrical new water treatment plant Upgrade existing plant New intake structure Pressure reducing station 1,400,000 US$ 1999-2`001
Coca Cola Nampula Mozambique Electrical installation at the new Coca Cola bottling plant. Design, supply and install and commission main incoming supply. 597,000 US$ 1999
Ilios Oil Edible Oil Refinery Gauteng Supply and install test and commissioning of structural, electrical mechanical, piping and instrumentation packages 383,334 US$ 1998
Mozal Main Substation Mozambique Supply and install test and electrical work, commissioning of lighting and small power installation including transformer, distribution boards and street lighting 300,000 US$ 1997-1998
Blantyre Water Board Malawi Installation of 35km of 700NB pipe 70 bar working pressure. All air valve chambers, crossover Tees and auxiliary equipment for cathodic protection on duplication of pipelines. 1,816,667 US$ 1998
National Starch Wadeville Gauteng Supply and installation of mechanical structural, electrical and instrumentation-Glass dissolving packages plant. 283,332 US$ 1998
Royal swazi Sugar Simunye Swaziland Drought relief pump station 4 off high flow pumps and 300m 1200 pipeline, all electrical controls and engineering design. 249,167 US$ 1995
Mzuzu Water Water Treatment Water affairs Gullivar/Cilcon joint Venture Mzuzu water treatment 1,111,778 US$ 1992-1994
Sasol 1 Sasolburg South Africa For Treatment (Pty) Ltd Installation of fuel distribution network system 800 NB pipe all work in accordance to API 1104. 361,280 US$ 1990-1991
Botswana meat Commission Lobatse Botswana For Wright Dixon Installation of new Sulzer cooling towers of all auxiliary pipe work. 1,213,970 US$ 1989
Zimbabwe power Corporation And Havelock Asbestos Mine Zimbabwe & Swaziland For Wright Dixon Removal of 3.75MW steam turbines plus all auxiliary equipment, re-installation and commissioning of all above equipment and new steam piping. 202,715 US$

1988